ZHCUB01E March 2021 – November 2024
PRODUCTION DATA
下面列出了每個(gè)器件的硬件和 SPI 型號(hào)的每個(gè)測(cè)試點(diǎn)對(duì)應(yīng)的信號(hào)。測(cè)試點(diǎn)的命名約定如下:SPI/硬件。首先列出器件 SPI 版本的測(cè)試點(diǎn)上的信號(hào),然后列出硬件型號(hào)。

| 測(cè)試點(diǎn)編號(hào) | DRV824x | DRV8145 |
|---|---|---|
| TP4 | nSLEEP | nSLEEP |
| TP7 | IPROPI | IPROPI |
| TP10 | nFAULT | nFAULT |
| TP11 | SDO/MODE | SDO/MODE |
| TP12 | SDI/ITRIP | SDI/ITRIP |
| TP13 | SCLK/SR | SCLK/SR |
| TP14 | nSCS/DIAG | nSCS/DIAG |
| TP15 | PH/IN2 | 不適用 |
| TP16 | EN/IN1 | EN/IN1 |
| TP17 | DRVOFF | EN/IN1 |

| 測(cè)試點(diǎn)編號(hào) | DRV8144 |
|---|---|
| TP3 | nSLEEP |
| TP4 | IPROPI |
| TP5 | nFAULT |
| TP7 | SDO/NC |
| TP10 | SDI/ITRIP |
| TP11 | SCLK/SR |
| TP12 | nSCS/DIAG |
| TP13 | IN |
| TP14 | DRVOFF |