ZHCSSL6C July 2023 – April 2024 TPS7H6003-SP , TPS7H6013-SP , TPS7H6023-SP
PRODUCTION DATA
請(qǐng)參考 PDF 數(shù)據(jù)表獲取器件具體的封裝圖。
Figure 9-2 100-V, 500-kHz Switch Node Signal From TPS7H6003EVM-CVAL
Figure 9-3 500-kHz Gate Driver Outputs in PWM Mode From TPS7H6003EVM-CVAL