SLVSHZ1A June 2024 – July 2025 TPS1HTC100-Q1
PRODUCTION DATA
請參考 PDF 數(shù)據(jù)表獲取器件具體的封裝圖。
With a GND network, tie the thermal pad with a single trace through the GND network to the board GND copper.