2 Test Standard and Requirements
The following test setup and requirements are based on the TPS2583X/4X-Q1 EVM to pass MFi OCP test:
- The test load waveform is shown in Figure 2.
- The test setup between the TPS2583x/4x-Q1 EVM and E-load includes lightning cable, test connection board. The setup as Figure 3.
- In practice, whether the test is passed is determined by whether the voltage at the E-load drops to 0 V.
- Due to the voltage drop on the cable and some characteristic of the connection board, the output voltage of TPS2583x/4x-Q1 should be higher to pass the test.