ZHCSUM5 February 2024 TUSB211A-Q1
PRODUCTION DATA
請參考 PDF 數(shù)據(jù)表獲取器件具體的封裝圖。
Figure 7-2 Near End Eye Measurement
Set-Up With Pre-Channel Cable
Figure 7-3 2 Meter Pre-Channel
Without TUSB211A-Q1
Figure 7-5 5 Meter Without TUSB211A-Q1
Figure 7-7 5 Meter Pre-Channel With
TUSB211A-Q1 EQ=2
Figure 7-4 2 Meter Pre-Channel With
TUSB211A-Q1 EQ=1
Figure 7-6 5 Meter Pre-Channel With
TUSB211A-Q1 EQ=1
Figure 7-8 Near End Eye Measurement
Set-Up With Post-Channel Cable
Figure 7-9 1 Meter Post-Channel
Without TUSB211A-Q1
Figure 7-11 2 Meter Post-Channel
Without TUSB211A-Q1
Figure 7-13 4 Meter Post-Channel
Without TUSB211A-Q1
Figure 7-10 1 Meter Post-Channel With
TUSB211A-Q1 EQ=0
Figure 7-12 2 Meter Post-Channel With
TUSB211A-Q1 EQ=1
Figure 7-14 4 Meter Post-Channel With
TUSB211A-Q1 EQ=2